Details | ESSER by Honeywell

FAAST LT-200 EB 2 with 2 channels, loop ready

801722.10 | FAAST LT-200 EB 2 with 2 channels, loop ready

The FAAST LT-200 EB 2-channel device is an advanced active fire detection system, equipped with 2 completely separate channels, each with a laser smoke detector. It’s possible to connect up to two pipelines per channel. The FAAST LT 2 has a preconfigured esserbus coupler for connection to the esserbus ring bus line.

Part-No.:
801722.10
Approval:
VdS

Features

  • 2-channel system for connecting max. 2 pipelines per channel
  • 2 independent measuring chambers, each with a fan, filter, sensor, and separate air outlets
  • Built-in and preconfigured esserbus coupler
  • 2 highly sensitive laser sensors for highest stability
  • 9 different adjustable sensitivity levels from 0.07% LD/m (separately adjustable per channel)
  • Programmable pre-alarm levels for each individual channel
  • Sophisticated detection algorithms reduce false alarms
  • PipeIQ software for intuitive system layout, configuration, and maintenance in a
  • simple LED overview with a detailed fault indicator
  • Unique airflow pendulum shows the current airflow of the individual channel
  • A fan for each channel, 10 individually-adjustable fan speeds
  • Operating volume from 28 dB(A) (at fan level 1)
  • Integrated event memory up to 2244 events
  • Ultrasonic flow rate sensor for accurate pipe flow measurement evaluable for each channel
  • USB interface
  • IP 65 protection rating
  • 2 removable integrated filter units
  • Operating menu in 24 languages
  • Set-up of a Type B two-detector dependency in accordance with DIN VDE 0833-2 and VdS 2095 possible


Approved for the requirements of EN 54-20 classes A, B, and C with the following information:

  • Max. 200 m pipeline length per channel
  • Max. 20 holes for class C per channel
  • Max. 10 holes for class B per channel
  • Max. 3 holes for class A per channel


Approved for the requirements of EN 54-20 classes A, B, C using the pre-alarm with the following information:

  • Max. 120 m pipeline length per channel
  • Max. 12 holes for class C per channel
  • Max. 4 holes for class B per channel